Home        News        Specifications        Shelter Assembly         Links        Contact Us

      

 

ASSEMBLY OF THE GLOBAL VILLAGE SHELTER


     The GVS is a rigid structure that can be assembled in the field by two people in approximately15 to 20 minutes.  The instructions are simple graphics with limited text.  The user simply unpacks the base and the roof modules and then assembles the GVS on site. Each unit is packaged with a set of laminated instructions.  No tools are required.  Once the roof has been placed onto the base (see below) the user will place the tarp on top of the roof and secure in place.

GVS base and roof beam assembly

GVS roof and placement assembly

 

For a printable high resolution image of on-site instructions click this thumbnail image

GVS on-site instructions